![]() |
||||||||||||||||||||||||||||||||||||||||||||||||||||||
![]() |
||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||
May 13 - 16, 2008 |
||
| MI: Management Issues | Abstracts: BP • EE • MI • PR • TH • VA | |
002 MI Continuous Extrusion Optimization System: Measure Twice ... Cut Once—Best of Track Award 004 MI Upcoming Structural Design Rule Changes Impacting Aluminum Extrusions 007 MI Indian Aluminum Extrusion Industry—Challenges and Opportunities 131 MI AEC Bonus Session: Extrusion Dies—The Key to Success 141 MI Implementation of Six Sigma Methodology into the Extrusion Die Shop 148 MI A Two-Decade Case Study—How Modeling Drove Exceptional Results |
||
| |||
© 2008 ET Foundation |